TPQA, TPQM, QA, QC

.

TPQA, TPQM, QA and QC

Quality is foremost with Arkitechno.

Arkitechno is responsible for testing the soil samples in the laboratory in such a way so as to meet the requirements of all the standards, and to satisfy the needs of the clients and regulatory authorities. Our test laboratory has been documented with the policies, systems, programs, procedures and instructions to assure the quality of all tests. Our quality system policies and objectives are defined in a quality manual, which outlines the structure of the documentation used in the quality system. The laboratory has procedures to control all documents that form part of its quality system.

After gathering all the data from the field and laboratory, the collected data is checked for quality and consistency. We are a part of a team that is highly involved in the engineering of the structure, and we interact with the designers and construction engineers even after our contractual obligations are over to ensure proper foundation performance.

In order to achieve these objectives, we operate a mandatory quality management system in conjunction with other management controls. The quality manual describes the quality system which meets the requirements of ISO 9001:2008.

PROJECTS

2013

Construction supervision as Third Party Quality Auditor for Construction of Multipurpose Cyclone Shelters, Construction / improvement of Approach Roads (Link Roads) under NCRMP- Odisha. Funded by World Bank. Credit No.4772-IN . (Till-2015)

2015

Construction supervision as Third Party Quality Audit for Construction of Multipurpose Cyclone Shelters, Construction / Improvement of Approach Roads to Cyclone Shelters, Raising and Strengthening of Saline Embankments under NCRMP- Odisha. Funded by World Bank. Credit No. 5413-IN. (Till-2017)

2015

Preparation of Smart City Proposal for assisting Imphal Municipal Council to participate in the Smart Cities Challenge. Funded by World Bank. (Till-2016)

2016

Third Party Quality control consultant for National Cyclone Risk Mitigation Project Phase – II (NCRMP-II)” for construction of MPCS and underground cabling of 430 km in the state of West Bengal Funded by World Bank. Credit No.56930-IN. (Till-2018)

2017

Technical Support Services Consultant, Cluster 2 for ‘Capacity augmentation of navigational infrastructure of National Waterway-1’ from Haldia to Allahabad (Jal Marg Vikas Project). (Till-2020)

2018

Third Party Quality Monitoring under PMAY (Till-2019)

2018

Third Party Quality Audit for NCRMP Goa. (Till-2021)